Roof shingles selection done and installed.
All rough MEPs completed.
Next steep: Windows installation, insulation and drywall hang.
New Septic system installed on sand bed and open up ready for inspections. Primer on stucco walls applied, tile flooring and wet areas completed, cabinets installed and countertops. Next stage: trim package installation. This model is almost completed.