Client satisfied with this structural repairs:
1. Shoring posts installation for removal of structural columns
2. Structural columns demo for an open view from the interior of the house to what is going to be a new pool.
3. Installation of structural steel Ibeam with steel angles support and red heads to every 24” on existing upper tie beam.
4. Framing work to cover new steel beam and to square the rest of arched headers in the pool lanai.
5. Stucco application on new framing.